Pipeline Replacement Program in Ulsan Port, Korea
| Date Awarded: |
2007 | ![]() |
| Client: |
SK Engineering & Construction | |
| Description: | ARV acted as project management consultants for SK Engineering & Construction (SKEC) on the design, tendering, award and construction of three new Single Point Mooring (SPM) loading/offloading lines and the refurbishment of their attending SPM Buoys. The project also featured three 42 inch pipelines of 6, 4 and 2 kilometres, respectively, with concrete coating, trenching and Rock Armouring. The lines were installed in a busy shipping channel. |
|
| Destination: |
Ulsan, Korea |

©2010 ARV Group