ARTHIT Pipeline End Manifold Tie-In Spool Recovery
| Date Awarded: |
2008 | ![]() |
| Client: |
PTT Exploration and Production Public Company Limited | |
| Description: |
ARV was contracted to remove the existing bolts connecting Z Spool to the pipeline end manifold flange, complete all necessary additional measurements, verify the previous measurements and metrology to ensure sufficient information was obtained to allow proper modification of the spool. The Z Spool was moved subsea to a recovery location for lifting with the crane barge. The Z Spool was recovered to the deck of the crane barge and transported to Maptaphut port and offloaded. |
|
| Destination: |
Map Ta Phut Port from Gulf of Thailand |